$1,622,716.55
10/26/19 - 11/22/21
Storm Drainage
$1,152,041.80
9/26/21 - 4/30/23
Colored Concrete Dam & Manholes, Concrete Riprap
$4,385,684.59
1/3/2022 – 2/03/23
Removals, Sidewalks, Driveways, Curb Ramps, Sodding, Meters/Boxes
$8,000,000
01/01/2023 - 12/31/2025
Concrete Paving, Sidewalks, Curbs, Driveways, Curb Ramps
$1,622,716.55
10/26/19 - 11/22/21
Storm Drainage